Cotton Bleaching line
Capacity: 600kg bleached dry cotton per 4 hours per bleaching machine. Two machine per shift 2400
kg bleached dry cotton.
1 TRUTZSCHLER cleaning line consist:
2 feeders
2 condensers
Step cleaning machine WILOMAT
Cyclone filters
Pipes
Production year: 1975
Floor plan: 3450 x 2930 x 3155
machine width : 1000 mm
2. Condenser under stamping machine
Producer : TRUTZSCHLER – PHEYDT ODENKIRCHEN
Construction year : 1975
Weight : 840 kg
Ventilator speed : n = 1700 turns. / min
3. Stamping machine - AUTEFA
Producer AUGSBURGER TEXTILMASCHINEN FABRIK
GMBH, ZRN
Construction year 1967
Lift distance 600 mm / min
Number of lifts : 60 dvigov / min
4. Rough material cake press – AUTEFA
Producer : AUGSBURGER TEXTILMASCHINEN FABRIK
GMBH, ZRN
Construction year 1967
Diameter of cake preparing basket 1480 mm
5. Electric lift – DEMAG
Producer : DEMAG FORDERTEHNIK, ZRN
Load capacity 4000 kp
LiftLng speed : 10 m / min
lift height : 7 m / min
Travel speed on gossip. : 14 m / min
6. Bleaching machine (apparatus) THIES 1. and THIES 2.
Producer : THIES
machine hitting stove
Useful volume 6.165 l 48 l
Max. temperature : 140 C 190 0C
Max. pressure : 4,5 bar 13 AT
Test pressure : 6 bar 20 bar
Machine diameter: 1.610 mm
Machine height : 2.355 mm
Wall thickness : 5 mm
Floorboard thickness : 8 mm
Thermometer : 0 – 160 C
7. Centrifuge
Manufacturer: KRANTZ company - FRG
Year of construction: 1989
diameter: 1,500 mm
height: 700 mm
turns in minute: 730
total weight: 2,800 kg
8. Two steps wet cake opener MECCANICA CARRESI
System no. 171 Model: 3653 Year: 2002
Total width 2730 mm
Internal sides 1400 mm
Maximum height from ground 3970 mm
Total length 8600 mm
Total weight kg 9000
Power installed kw 25
Electrical power supply volts 380 hz 50
Air pressure 6 bar
Capacity 400kg/h
9. Drum dryer FLEISSNER
Producer : FLEISSNER MASCHINENFABRIK Gmbh&Co
Construction year : 2002
Drying temperature : 120 - 140 C
Number of drums : 4
Production width : 1.400 mm
Floor plan : 4.288 x 8.057 mm
Material: bleached cotton (Noils)
Fiber length: 15 - 16 mm
Initial moisture content: 60 - 70% (after centrifugation)
Final moisture content: 6 - 8%
Throughput: 350 kg / h (μ = 0.85) (daily capacity about 6500 kg / day with good
pre-opening and continuous uniform template in 22 hours) at 70%
AF and EF 8%
Water evaporation: about 230 kg / h (under production) about 280 kg / h (design of
heating)
Drying temperature: 140 - 120 C
Gas consumption: approximately 0.16 Nm3 / kg water to be evaporated
Electric power consumption: about 80% of installed capacity
Consumption of compressed air: 1 - 2 m3 / h plant data
Working width: 1400 mm
Heating: natural gas Hu = 34.000 KJ / Nm3
Compressed air: 6 bar (dry, water- and oil-free)
Installed electric power: approximately 64 kW
10. Chemical storage and dosing equipment:
a. Hydrogen peroxide
b. Sodium Hydroxide and Acetic acid:
11. Waste water recuperation system: